PEIR and Supporting Documents
You can access the PEIR and supporting documents below.
The Non-Technical Summary is also available here
1.1 Guide to the Formal Consultation Material.
We recommend everyone reads this guide to help them understand the submission documents and where to find what they are looking for.
2.2 Draft Works Plans Offshore
2.3 Draft Location Plan Onshore
2.4 Draft Location Plan Offshore
2.5 Draft Public Rights of Way Plan
2.6 Draft Historic Environment Plan Onshore
2.7 Draft Statutory and Non‐Statutory Nature Conservation Sites Onshore
2.8 Draft Statutory and Non‐Statutory Nature Conservation Sites Offshore
2.9 Draft Onshore Crossings Plan
2.10 Draft Offshore Crossings Plan
Please click here to download GIS and KMZ shape files
The report as submitted at Scoping, to inform the items for included for consultation and for DCO Application.
Non-Technical Summary
We recommend everyone reads this summary to help them understand the submission documents and where to find what they are looking for.
Introductory
6.1.2 Need, Policy and Legislative Context
6.2.3.1 Cable Burial Risk Assessment
6.2.3.2 Underwater Noise Assessment
6.2.3.3 Onshore Substation Design Principles
6.1.4 Site Selection and Consideration of Alternatives
6.2.4.1 Landfall Assessment and Offshore ECC Route Optioneering
6.2.5.1 Cumulative Effects Assessment Longlist Offshore
Offshore
6.1.7 Marine Physical Processes
6.2.7.1 Physical Processes Technical Baseline
6.2.7.2 Physical Processes Modelling Report
6.1.8 Marine Water and Sediment Quality
6.2.8.1 Water Framework Directive
6.1.9 Benthic and Intertidal Ecology
6.2.9.1 Benthic Ecology Technical Report (Array)
6.2.9.2 Benthic Ecology Technical Report (ECC)
6.2.9.3 Intertidal Technical Report
6.2.9.4 Marine Conservation Zone Assessment
6.1.10 Fish and Shellfish Ecology
6.2.10.1 Fish and Shellfish Ecology Technical Baseline
6.2.11.1 Marine Mammals Technical Baseline
6.1.12 Offshore and Intertidal Ornithology
6.2.12.1 Offshore and Intertidal Ornithology Baseline Characterisation Report
6.2.12.2 Collision Risk Modelling Assessment Annex
6.2.12.3 Displacement Assessment Annex
6.1.13 Marine and Intertidal Archaeology
6.2.13.1 Marine and Intertidal Archaeological Technical Report
6.2.14.1 Commercial Fisheries Technical Report
6.1.15 Shipping and Navigation
6.2.15.1 Navigational Risk Assessment
6.1.16 Aviation, Radar, Military and Communication
6.2.16.1 Aviation Technical Report
6.1.17 Seascape, Landscape and Visual
6.2.17.2 SLVIA Figures Wirelines and Visualisations
Onshore
6.2.19.1 Onshore Air Quality Construction Phase Dust Assessment Methodology
6.2.19.2 Non-Road Mobile Machinery Emissions Assessment
6.2.19.3 Offshore Activities Assessment
6.2.19.4 Road Traffic Dispersion Modelling
6.1.20 Onshore Archaeology and Cultural Heritage
6.2.20.1 Onshore Archaeology and Cultural Heritage Desk-Based Assessment
6.2.20.2 Onshore Archaeology and Cultural Heritage Statement
6.2.21.1 Onshore Ecology Ecological Desk-Based Assessment
6.2.21.2 Initial Habitat Survey
6.2.21.3 Preliminary Roost Surveys for Bats
6.1.23 Geology and Ground Conditions
6.1.24 Hydrology, Hydrogeology and Flood Risk
6.2.26.1 Sound Level Meter Calibration Certificates
6.2.26.2 Full Baseline Survey Results
6.2.26.3 Construction Plant List
6.2.27.1 Traffic and Transport Technical Baseline Report – Part 1
– split into two for website download, but available as one document
6.2.27.1 Traffic and Transport Technical Baseline Report – Part 2
– split into two for website download, but available as one document
6.2.27.2 Traffic and Transport Trip Generation
6.1.28 Landscape and Visual Assessment
6.2.28.1 Landscape and Visual Assessment Visualisations – Part 1
– split into two for website download, but available as one document
6.2.28.1 Landscape and Visual Assessment Visualisations – Part 2
– split into two for website download, but available as one document
7.1 Draft Without Prejudice Report to Inform Appropriate Assessment
7.2 Draft Without Prejudice Benthic Compensation Strategy
7.3 Draft Without Prejudice Offshore Ornithology Compensation Strategy
7.4 Draft Without Prejudice Offshore Artificial Nesting Structures Ecological Evidence and Roadmap
7.5 Draft Without Prejudice Predator Reduction Ecological Evidence and Roadmap
7.6 Draft Without Prejudice Fisheries Management Ecological Evidence and Roadmap
All documents beginning 8.1 will form part of the Code of Construction
Practice to be submitted as part of the DCO Application.
8.1.1 Outline Noise and Vibration Management Plan
8.1.2 Air quality management plan
8.1.3 Outline Soil management plan
8.1.4 Outline Pollution Prevention and Emergency Incident Response Plan
8.1.5 Outline Construction Traffic Management Plan
8.1.7 Outline Public Access Management Plan
8.1.8 Outline Preliminary Crossing Schedule Onshore
8.1.9 Outline Preliminary Crossing Schedule Offshore
8.1.10 Outline Artificial Light Emissions Management Plan
8.3 Outline Biodiversity and Marine Net Gain Principles and Approach
8.4 Outline Marine Mammal Mitigation Protocol
8.5 Archaeological Written Scheme of Investigation Offshore
8.6 Archaeological Written Scheme of Investigation Onshore
8.7 Landscape and Ecology Design Principles Plan (LEDPP)