8. Other Reports and Documents

All documents beginning 8.1 will form part of the Code of Construction
Practice to be submitted as part of the DCO Application.

            8.1.1    Outline Noise and Vibration Management Plan

            8.1.2    Air quality management plan

            8.1.3    Outline Soil management plan

            8.1.4    Outline Pollution Prevention and Emergency Incident Response Plan

            8.1.5    Outline Construction Traffic Management Plan

            8.1.6    Outline Travel Plan

            8.1.7    Outline Public Access Management Plan

            8.1.8    Outline Preliminary Crossing Schedule Offshore

            8.1.9    Outline Preliminary Crossing Schedule Onshore

            8.1.10 Outline Artificial Light Emissions Management Plan

8.2       Planning Statement

8.3       Outline Biodiversity and Marine Net Gain Principles and Approach

8.4       Outline Marine Mammal Mitigation Protocol

8.5       Archaeological Written Scheme of Investigation Offshore

8.6       Archaeological Written Scheme of Investigation Onshore

8.7       Landscape and Ecology Design Principles Plan (LEDPP)

8.8       Outline Flood Risk Assessment

8.9       Cable Specification and Installation Plan

7. Report to Inform Appropriate Assessment (RIAA)

7.1       Draft Without Prejudice Report to Inform Appropriate Assessment

7.2       Draft Without Prejudice Benthic Compensation Strategy

7.3       Draft Without Prejudice Offshore Ornithology Compensation Strategy

7.4       Draft Without Prejudice Offshore Artificial Nesting Structures Ecological Evidence and Roadmap

7.5       Draft Without Prejudice Predator Reduction Ecological Evidence and Roadmap

7.6       Draft Without Prejudice Fisheries Management Ecological Evidence and Roadmap

6. Preliminary Environmental Information Report (PEIR)

Non-Technical Summary

6.1.0    Non-Technical Summary

We recommend everyone reads this summary to help them understand the submission documents and where to find what they are looking for.


Introductory

6.1.1    Introduction

6.1.2    Need, Policy and Legislative Context

6.1.3    Project Description

            6.2.3.1 Cable Burial Risk Assessment

            6.2.3.2 Underwater Noise Assessment

            6.2.3.3 Onshore Substation Design Principles

6.1.4    Site Selection and Consideration of Alternatives

            6.2.4.1 Landfall Assessment and Offshore ECC Route Optioneering

6.1.5    EIA Methodology

            6.2.5.1 Cumulative Effects Assessment Longlist Offshore

            6.2.5.2 Cumulative Effects Assessment Longlist Onshore

6.1.6    Consultation Process


Offshore

6.1.7    Marine Physical Processes

            6.2.7.1 Physical Processes Technical Baseline

            6.2.7.2 Physical Processes Modelling Report

6.1.8    Marine Water and Sediment Quality

            6.2.8.1 Water Framework Directive

6.1.9    Benthic and Intertidal Ecology

            6.2.9.1 Benthic Ecology Technical Report (Array)

            6.2.9.2 Benthic Ecology Technical Report (ECC)

            6.2.9.3 Intertidal Technical Report

            6.2.9.4 Marine Conservation Zone Assessment

6.1.10 Fish and Shellfish Ecology

            6.2.10.1 Fish and Shellfish Ecology Technical Baseline

6.1.11 Marine Mammals

            6.2.11.1 Marine Mammals Technical Baseline

6.1.12 Offshore and Intertidal Ornithology

            6.2.12.1 Ornithology Technical Baseline

            6.2.12.2 Collision Risk Modelling Assessment Annex

            6.2.12.3 Displacement Assessment Annex

6.1.13 Marine and Intertidal Archaeology

            6.2.13.1 Marine and Intertidal Archaeological Technical Report

6.1.14 Commercial Fisheries

            6.2.14.1 Commercial Fisheries Technical Report

6.1.15 Shipping and Navigation

            6.2.15.1 Navigational Risk Assessment

6.1.16 Aviation, Radar, Military and Communication

            6.2.16.1 Aviation Technical Report

6.1.17 Seascape, Landscape and Visual

           6.2.17.1 SLVIA Methodology

           6.2.17.2 SLVIA Figures Wirelines and Visualisations

6.1.18 Marine Infrastructure and Other Users

           6.2.18.1 Helicopter Access Report


Onshore

6.1.19 Onshore Air Quality

           6.2.19.1 Onshore Air Quality Construction Phase Dust Assessment Methodology

           6.2.19.2 Non-Road Mobile Machinery Emissions Assessment

           6.2.19.3 Offshore Activities Assessment

6.1.20 Onshore Archaeology and Cultural Heritage

           6.2.20.1 Onshore Archaeology and Cultural Heritage Desk-Based Assessment

           6.2.20.2 Onshore Archaeology and Cultural Heritage Statement

6.1.21 Onshore Ecology

           6.2.21.1 Onshore Ecology Ecological Desk-Based Assessment

           6.2.21.2 Initial Habitat Survey

           6.2.21.3 Preliminary Roost Surveys for Bats

6.1.22 Onshore Ornithology

           6.2.22.1 Onshore Ornithology Desk Study

           6.2.22.3 Winter Bird Survey 2022 – 2023

           6.2.22.4 Birds Species List

6.1.23 Geology and Ground Conditions

6.1.24 Hydrology, Hydrogeology and Flood Risk

6.1.25 Land Use

6.1.26 Noise and Vibration

           6.2.26.1 Sound Level Meter Calibration Certificates

           6.2.26.2 Full Baseline Survey Results

           6.2.26.3 Construction Plant List

           6.2.26.4 Noise Model Outputs

6.1.27 Traffic and Transport

           6.2.27.1 Traffic and Transport Technical Baseline Report

           6.2.27.2 Traffic and Transport Trip Generation

6.1.28 Landscape and Visual Assessment

           6.2.28.1 Landscape and Visual Assessment Visualisations


Wider

6.1.29 Socio-Economic Characteristics

6.1.30 Human Health

           6.2.30.1 Population Baseline

6.1.31 Climate Change

5. Consultation Summary

5.1       Consultation Summary

5.1.1    Statement of Community Consultation

5.1.2    Formal Notices

5.1.3    Phase 1 Consultation Documentation

5.1.4    Phase 1A Consultation Documentation

5.1.5    Community Liaison Group Documentation

4. Scoping Report

4.1      Scoping Report

The report as submitted at Scoping, to inform the items for included for consultation and for DCO Application.

2. Plans

2.1       Draft Works Plans Onshore

2.2       Draft Works Plans Offshore

2.3       Draft Location Plan Onshore

2.4       Draft Location Plan Offshore

2.5       Draft Public Rights of Way Plan

2.6       Draft Historic Environment Plan Onshore

2.7       Draft Statutory and Non‐Statutory Nature Conservation Sites Onshore

2.8       Draft Statutory and Non‐Statutory Nature Conservation Sites Offshore

2.9       Draft Onshore Crossings Plan

2.10     Draft Offshore Crossings Plan

1. Guide to the Phase 2 Consultation Material

1.1       Guide to the Formal Consultation Material.

We recommend everyone reads this guide to help them understand the submission documents and where to find what they are looking for.